Elevator / Escalator installation jobs executed by field personnel deputed through us for reference purposes only:
Project
Location
Total
Units
Stops/
Openings
Travel(mtrs)
Speed(mps)
Drive, Control
& Special Features
Leading Bank
Bahrain
7
2 to 28
120 to124
2.5 , 6
"Gearless FM 500, TX VF 220,
Lobby Vision
Automatic Intelligence
Traffic Processor
(AITP) Gearless FM 280,
VX VF 70"
Leading Hotel
UAE
31
2 to 36
4 to 139.53
0.63, 1.5 ,2.5
"Gearless FM 280,
VX VF70/VF 120,
Hydraulic, SX VF 30 BR,
Hydraulic Platform"
Tower
Fujairah
11
3 to 38
13 to 158.9
0.63 , 4 ,1.6
"Gearless, FM280,
Miconic 10, VF85 BR Hydraulic,
SX VF 30, Escalator"
Construction Co.
UAE
4
4 to 5
11 to 14.38
1
MRL
Villa
UAE
1
2
3.8
1
MRL
Tower
Dubai
6
3 to 11
13.85 to 19
1 , 0.61 , 1.75
"Hydraulic, SX VF30 BR
Geared VC VF 70/30"
Bank
Fujairah
2
10
43.86
1.75
Geared,VX VF70 BR
Telecom Tower
UAE
1
2
4
1
Hydraulic, SX VF30 BR
Tower
Bahrain
9
45
9 to 160
5
Escalators,
9300-10-EN-35-100-K-R-5450mm
Tower
UAE
13
7 to 44
16.8/66.45/170
1.75 to 3
"MIC- 10 – GC 4M10 / 3M10/MIC-TX-GC 1ks MIC.TX VVVF"
Tower
UAE
21
2 to 46
57/157.95/164.75
3
500P, EBK-D.E, EBK- S.E
Tower
UAE
26
28 to 86
97.9/163.75
3
500P, EBK-D.E, EBK- S.E
Tower
UAE
28
4 to 41
23.3/25.75/
141.55
1 , 3.5 , 6
Euro, S700, 500 P, EBK
Tower
Bahrain
34
7 to 56
"51/205.4/216.8
95.2/148.4/205
4.6/27/33"
1,1.5 ,2.5 , 6
"S700/500 P/ 300PCL,
Simplex, 6 Car Group Euro/300PCL,
Simplex,Duplex, 2300PCL,1300PCL"
Tower
Bahrain
22
--
--
0.5
"Step width in MM 1000,
inclination in Degree,
Floor Hieght 3200/3300/3700, 5100/4500/4700"
Mall
Dubai
88
4 to 10
13/20/29.4
1.5
TX-GX-SIMP,3KS, 2 KS,
1KS, Machine Rooom,
W/MR, MRL
Mall
Dubai
152
1st to 2nd
3.15 to 7
--
Pit size
3180 x5200 x 1400,
1600 x5200 x 1400,
Pit casted
Hotel

Oman

10
5 to 36
14 to 133
2.5
Geared, OVF5, MCS 320,